Remedial Design Assistance

The SCG team has more than 30 years experience in the design and installation of petroleum remedial systems. System application knowledge coupled with innovative piping and wellhead design is the foundation of SCG’s advantage.

Experience with over 100 Multiphase Extraction (MPE) and Dual Phase Extraction (DPE) system design and installations gives SCG a unique perspective on system design, allowing us to effectively meet our clients design requirements.
 
               
 
 
 
 
 
 
 
 
 
 
 
                  


Pilot testing

 
Recording data during a pilot test
 

Pilot scale testing is a critical part of the design process.